You're Losing ₦500K+ Every Month You Delay Your LPG Plant Installation
Nigeria's LPG demand is surging—but rising costs, and installation backlogs mean every month you wait costs you:
❌ Higher equipment prices (15% increase expected)
❌ Lost revenue from unmet customer demand
❌ Missed Q4 peak sales season (Dec–Jan accounts for 40% of annual LPG sales)
One Mass Energy eliminates these risks. We've installed 47 compliant plants across Nigeria in 2025 alone—handling approvals, site prep, safety testing, and turnkey delivery in 28–30 days. No delays. No compliance issues. No guesswork.
October Action Plan:
Reserve your installation slot now and lock in current pricing before the price increase. Only few slots remaining for this months delivery.
⚠️ URGENT: LPG equipment costs rising 15% November 2025 due to FX volatility. Lock current pricing now
You can start your journey with One Mass Energy by contacting experts. We provide initial assessments and offer a range of skid plants tailored to your business needs.
Why Choose One Mass Energy?
Years of industry experience.
Affordable pricing tailored to your budget.
Reliable construction and installation services.
Ready to start your LPG plant project? Let One Mass Energy guide you with consultation and expert advice.
Select the right tank size and determine the type of setup starting from ₦6M based on your business goals:
Tank Sizes:
1.5-ton Skid Plant: Ideal for small businesses.
2.5-ton Skid Plant: Perfect for mid-scale operations.
3.5-ton and 5-ton Gas Plants: Best for large-scale businesses.
Setup Options:
Skid-mounted systems for compact and mobile needs.
Gas plant setups for high-volume operations.
You can go ahead and explore our full Tank and Setup Catalog to find the perfect fit by clicking the button below.
Please make sure your project meets all safety requirements.
One Mass Energy simplifies the providing essential products needed for safety of your skid plant location.
Safety and quality are our top priorities. Every OME Energy installation undergoes:
UTM Testing: Ensures tank integrity.
Pressure Testing: Verifies pipeline and valve safety.
We provide a comprehensive report for your peace of mind.
Ensure safety and quality with our comprehensive UTM and pressure testing services.
Testing Stage
Finsihing Stage
Don't wait—join the waitlist now and take advantage of our expertise and premium solutions!
Prepare the site for safe and efficient installation. Our team ensures:
Land Clearing and Leveling:
Remove all debris and level the ground.
Reinforced Concrete Foundation:
Build a foundation capable of supporting the selected tank size.
Our engineers use the latest techniques to create a stable base for your plant.
To prepare your site correctly with our step-by-step guidance and professional construction services, click on the button below to get started.
We ensure the safe transport and delivery of your LPG tank or skid plant:
Use certified logistics providers to handle sensitive equipment.
Deliver within 28 - 30 days of order confirmation.
Tip: Track your delivery in real-time with OME's logistics network.
Please make sure LPG skid plant or tank delivery with a certified logistics network.
Ready to take the next step? One Mass Energy is here to make your dream of owning a profitable LPG plant a reality. Contact us today and enjoy:
Affordable pricing.
Expert installation and training.
Frequently Asked Questions
Q: How much does installation cost?
A: Investment ranges from ₦6M–₦35M depending on tank size (1.5-ton to 5-ton), site prep needs, and safety features.
Q: Do you offer payment plans?
A: Yes. We accept milestone-based payments: 30% deposit, 40% pre-delivery, 30% post-installation. Financing partners available.
Q: How long does installation take?
A: 28–30 days from order confirmation to operational plant—including approvals, site prep, and safety testing.
Q: Can I install on leased land?
A: Yes, with landlord consent and land use documentation.