Building plan approval, commonly called a building permit in Lagos, is a legally required process that ensures your construction project is safe, compliant, and secure from demolition threats.
Whether you’re building a bungalow, high-rise, warehouse or gas station, the Lagos State Government mandates specific documents based on building type and location.
This detailed guide outlines all documents required, explains costs, and helps you avoid unnecessary penalties and delays.
✅ Want a fast overview instead? → Read our simplified 10-Step Approval Guide
💡 Need help with your Building Approval?
Let our experts handle the process for you — from survey plans to architectural drawings. Click on the buttons below to 📞 Call 09025234582 or chat on WhatsApp
A building permit (or building plan approval) is an official authorisation from the Lagos State Government allowing you to legally begin construction. It ensures that your structure complies with planning, zoning, safety, and environmental laws.
Avoid demolition and stop-work orders
Meet legal and safety standards
Increase property resale value
Qualify for insurance and financing
📌 Click here to read a real case study of how we helped a client avoid demolition
Architectural Drawings
Tax Clearance Certificate
Land Use Charge Receipt
Proof of Ownership
Survey Plan
All of the above, plus:
Structural Drawings
COREN Structural Stability Letter
COREN Supervision Letter
Pundit Test Report
COREN Calculation Sheets
Subsoil Investigation Report
Same as above, required for increased floor levels
Includes:
Electrical Drawings
Mechanical Drawings
PPTR Report
EIA Report
All of the above
Architectural Drawings
Tax Clearance Certificate
Land Use Charge Receipt
Proof of Ownership
Survey Plan
Structural Drawings
COREN Structural Stability Letter
COREN Supervision Letter
Pundit Test Report
COREN Calculation Sheets
Subsoil Investigation Report
Electrical & Mechanical Drawings
PPTR Report
EIA Report
All of the above, plus:
Police Clearance
Fire Clearance
✅ Gas Plant requirements are similar to petrol station requirements.
- 2 Passport photographs
- NIN, Name, Address, Phone Number, Email, Date Of Birth
To obtain building permit approval in Lagos State, several documents that are needed have been listed above.
To ensure your full understanding of some of the documents and plans to achieve compliance with regulatory standards and facilitate a smooth approval process.
We have broken down and explained some of the key documents you'll need below:
Survey Plan
Must be registered in Lagos State's database. 📌 See how to verify a survey & spot fakes
📈 See current survey pricing in Lagos
Architectural Drawing
Includes floor plans and elevation used for calculating approval cost.
Land Use Planning Report (LUPAR)
Prepared by a registered town planner, includes full site analysis.
Soil Test Report
Required for multi-floor or swampy area projects. 📌 See our full guide to soil testing here
The cost of building approval in Lagos state is determined by multiplying the volume of the building (length, breadth, and height) by the prevailing rate, which is determined by the zone in which the land is located in Lagos state, then adding fencing fees
Formula for Cost Calculation
Building Volume (L x B x H) × Rate + Fencing Fees + Layout + LPO + Registration Fee.
🧾 Stage Certification Fees
35% of Building Assessment Fee (paid separately).
🧱 Example – Igbogbo Project Breakdown
Building Volume: 1,320.33 m³ × ₦150/m³ = ₦198,048.98
Add LPO, layout, fencing, stage fees → Total ~₦580,922.28
When seeking building plan approval in Lagos State, it's essential to understand the various fees involved. Below is a comprehensive breakdown of the payments required during the building plan approval process:
Stage certification fee (35% of the building assessment)
Registration and application form fee
Building assessment fee
Layout fee
L.P.O (Local Planning Office) fee
LASEMA (Lagos State Emergency Management Agency) fee
LASPPPA (Lagos State Physical Planning Permit Authority) fee
Assessment for pumps for gas stations and petrol stations
Processing fee
Renovation fee (for renovations)
Penal fee (for existing buildings without approval)
Infrastructure development charge
Note:
All types of buildings proposed to be constructed or existing in Lagos state now require a Land Use And Analysis Report (LUPAR)
Obtaining building approval in Lagos State involves various fees that contribute to the overall cost of the process. Let's break it down in a straightforward manner:
Calculate the Building Assessment using the formula:
Length×Breadth×Height×Rate+FencingFees
N10,000 for the first 650 sqm.
N4,000 for every additional 1,000 sqm.
Layout Fees: N100,000
Registration & Application Form: N50,000
L.P.O (Letter of Permission): 10% of Building Assessment for All Applications..
LASEMA Fee (Commercial Projects Only): Set by the Lagos State Emergency Management Agency.
Adding these fees to the equation, the overall cost becomes:
Processing Fee = Building Assessment + Fencing Fees + Layout Fees + Registration & Application Form + (10 percent Building Assessment)
Understanding these costs is crucial for effective budgeting when pursuing building approval.
For personalised insights based on your specific project, contact us for our building permit services.
Get survey
Get an architectural drawing
Prepare LUPAR
Soil test
Submit for approval assessment
Get stamped approval
Pay all fees
Collect permit
Submit to LASBCA
Begin construction
Prefer it short and sweet? → Use our 10-Step Quick Guide Here
Let our experts handle it — from survey to drawings to approval. 👉 Click here to chat on WhatsApp 📞 Or call: 09025234582