Planning to paint your 3-bedroom duplex in Nigeria? This comprehensive case study analyzes the exact painting costs for a typical 3-bedroom duplex using real floor plan measurements and current 2025 paint prices. Whether you're in Lagos, Abuja, Port Harcourt, or any Nigerian city, this detailed breakdown helps you budget accurately for your painting project.
OME Buildway Contracting Limited has completed hundreds of 3-bedroom duplex painting projects across Nigeria. This case study reflects real-world costs based on actual projects, helping you understand the true investment required for professional painting services.
Total Building Dimensions: 18.5m x 37.65m
Ground Floor: Living room, dining, kitchen, guest toilet, entrance, verandah, car porch
First Floor: 3 bedrooms, 2 bathrooms, void areas
Wall Height: Standard 3.0m (10 feet) ceiling height
Construction: Modern duplex with standard finishes
Ground Floor Rooms:
Living Room: Large open space
Dining Area: Connected to kitchen
Kitchen: Modern layout with utility area
Guest Toilet: Standard size
Entrance Hall and Staircase
Verandah: Covered outdoor space
Car Porch: External covered area
First Floor Rooms:
Master Bedroom: En-suite bathroom
Bedroom 2: Standard size
Bedroom 3: Standard size
Shared Bathroom: Full bathroom
Staircase and Landing Areas
Total Interior Walls: 850 square meters
Ceiling Areas: 320 square meters
Interior Doors: 14 doors (both floors)
Interior Windows: 16 windows
External Walls: 580 square meters
External Doors: 3 doors
External Windows: 12 windows
Verandah Ceiling: 45 square meters
Interior Painting
Caplux Emulsion (20L x 4 buckets): β¦215,928
Cap Acrylic Satin for bathrooms/kitchen (20L x 1): β¦102,207
Interior doors/windows gloss (4L x 4): β¦161,888
Primers and preparation: β¦85,000
Interior Materials Subtotal: β¦565,023
Exterior Painting
Caplux Textured (20L x 3 buckets): β¦224,387
External doors/windows gloss (4L x 2): β¦80,944
Surface preparation and primers: β¦95,000
Exterior Materials Subtotal: β¦400,331
Total Cap Paint Materials: β¦965,354 Professional Labor: β¦450,000 - β¦550,000 Grand Total: β¦1,415,354 - β¦1,515,354
Interior Painting
Superstar Matt (20L x 4 buckets): β¦215,920
Superstar Satin for wet areas (20L x 1): β¦114,689
Interior gloss for doors/windows (4L x 4): β¦160,543
Primers and preparation: β¦120,440
Interior Materials Subtotal: β¦611,592
Exterior Painting
Luxol Premium Matt (20L x 3 buckets): β¦374,893
External gloss (4L x 2): β¦96,097
Surface preparation: β¦110,000
Exterior Materials Subtotal: β¦580,990
Total Berger Paint Materials: β¦1,192,582 Professional Labor: β¦480,000 - β¦580,000 Grand Total: β¦1,672,582 - β¦1,772,582
Interior Painting
Core 10 Emulsion (20L x 4 buckets): β¦508,760
Silk Emulsion for living areas (20L x 1): β¦168,393
Interior gloss for doors/windows (4L x 4): β¦188,867
Primers and preparation: β¦140,000
Interior Materials Subtotal: β¦1,006,020
Exterior Painting
Weathershield Smooth (20L x 3 buckets): β¦521,964
External gloss (4L x 2): β¦96,956
Professional surface preparation: β¦130,000
Exterior Materials Subtotal: β¦748,920
Total Dulux Paint Materials: β¦1,754,940 Professional Labor: β¦520,000 - β¦620,000 Grand Total: β¦2,274,940 - β¦2,374,940
Surface preparation and cleaning
Primer application
Two coats of paint application
Door and window frame painting
Clean-up and site restoration
Quality inspection and touch-ups
Location: Lagos/Abuja (higher), other states (moderate)
Access: Ground floor vs. first floor painting
Surface Condition: New vs. repainting existing surfaces
Timeline: Standard vs. urgent completion
Quality Level: Standard vs. premium finish requirements
New Building: β¦80,000 - β¦120,000 (basic preparation)
Existing Building: β¦120,000 - β¦180,000 (includes scraping, repairs)
Problem Surfaces: β¦200,000+ (dampness, cracks, extensive repairs)
Standard Timeline (2-3 weeks): Base pricing
Fast-Track (1-2 weeks): +15-20% surcharge
Express Service (under 1 week): +25-35% surcharge
Cap Paint: 3-5 years exterior, 5-7 years interior
Berger Paint: 5-7 years exterior, 7-10 years interior
Dulux Paint: 8-12 years exterior, 10-15 years interior
Cap Paint: β¦283,071 - β¦303,071 per year
Berger Paint: β¦239,540 - β¦354,516 per year
Dulux Paint: β¦189,578 - β¦296,868 per year
Dulux offers the best long-term value despite higher upfront costs.
Accurate measurements using professional tools
Quality control at every stage
Genuine paint products guarantee
Skilled painters with duplex experience
Project completion insurance
2-year workmanship warranty
Ready to get a precise quote for your 3-bedroom duplex?
OME Buildway Contracting Limited provides detailed, accurate quotes based on your specific floor plan and requirements. We offer professional measurement services and customized pricing for your exact project needs.
Get a personalized painting quote in 24 hours!
Simply send us:
Your building floor plans (photos or PDF)
Preferred paint brand and colors
Timeline requirements
Special surface conditions
Our architects and quantity surveyors will provide:
Exact surface area calculations
Detailed material requirements
Accurate cost breakdown
Professional recommendations
This service fee covers professional measurement analysis, material calculations, and detailed project planning by our certified team.
These estimates are based on real projects and current market prices. Actual costs may vary Β±10% based on specific site conditions, access challenges, and surface preparation requirements.
For long-term value, Dulux provides the best cost-per-year despite higher upfront costs. For immediate budget constraints, Cap Paint offers decent quality at affordable prices.
Standard timeline is 2-3 weeks including surface preparation, primer, and two coats. Weather conditions and surface complexity can extend timelines.
Yes, it's more cost-effective to do both together. You save on mobilization costs, scaffolding setup, and can negotiate better rates for larger projects.
Surface preparation includes cleaning, scraping old paint, filling cracks, sanding rough areas, and applying appropriate primers for optimal paint adhesion.
While possible, professional contractors get better prices and guarantee paint authenticity. Self-purchase risks include wrong quantities, fake products, and warranty issues.
Work with certified contractors like OME Buildway who source directly from authorized dealers. We provide paint authenticity guarantees and proper storage handling.
Additional costs arise from extensive repairs, difficult access areas, color changes requiring extra coats, premium color selections, and accelerated timelines.